当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1) 对当前系统配置的外接相关设备(制票机、外接屏幕等)进行检测,检测设备的可用性,非必要设备如果检测不能通过,则提示操作员,但是必要设备(制票机等)如果不能通过检测系统不能登录。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1) 对当前系统配置的外接相关设备(制票机、外接屏幕等)进行检测,检测设备的可用性,非必要设备如果检测不能通过,则提示操作员,但是必要设备(制票机等)如果不能通过检测系统不能登录。
问题补充:

  • 匿名
2013-05-23 12:21:38
1) detection, the availability of testing equipment, related equipment on the current system configuration, an external (system of ticket machines, the external screen, etc.), non-essential equipment, if the detection is not passed, the operator is prompted, but the necessary equipment (system ticke
  • 匿名
2013-05-23 12:23:18
1) * of the Current System Configuration to an external device (a ticket machine, and an external screen, etc. ) for testing, test the usability of the device, the non-essential equipment if the test fails, then prompts the operator, but necessary equipment (a ticket machine, etc. ) if the test fail
  • 匿名
2013-05-23 12:24:58
1) Meets the correlation equipment to current system disposition outside (system ticket machine, outside meets screen and so on) to carry on the examination, the check-out facility usability, if the non-fittings the examination cannot pass, then prompt operator, but fittings (system ticket machine a
  • 匿名
2013-05-23 12:26:38
1) add-ins on the current system configuration-related equipment (making machine, external screen, etc) for testing, testing equipment availability, non-essential equipment if the test is not passed, prompts the operator, but the necessary equipment (ticket machine) if not by detecting system cannot
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭