|
关注:1
2013-05-23 12:21
求翻译:论述了丰满水库大坝向下移址120米重建,按设计建成后新坝的出水口高度抬高,导致水库冬季出水口水温降低,直接影响雾凇景观。是什么意思?![]() ![]() 论述了丰满水库大坝向下移址120米重建,按设计建成后新坝的出水口高度抬高,导致水库冬季出水口水温降低,直接影响雾凇景观。
问题补充: |
|
2013-05-23 12:21:38
Discusses the full down dam site 120 meters to the reconstruction, according to the design after the completion of the new dam height of the outlet elevation, leading to the reservoir outlet water temperature lower in winter, directly affect the rime landscape.
|
|
2013-05-23 12:23:18
Discusses the plump relocated downwards Reservoir Dam 120 meters according to the design and reconstruction after the completion of the new Dam reservoir inlets winter highly inflated, led to the water temperature drops, and has a direct impact on saliva frost landscape.
|
|
2013-05-23 12:24:58
Elaborated the plentiful reservoir dam to move downward the site 120 meters reconstruction, completed the new dam water outlet after the design to raise highly, causes the reservoir winter water outlet water temperature to reduce, affected the fog song landscape directly.
|
|
2013-05-23 12:26:38
Discusses the down site 120 m redevelopment of fengman reservoir dam, according to the design after the completion of new dam outlet height of elevation, cause a reduction in reservoir outlet water temperature in winter, directly affecting rime landscape.
|
|
2013-05-23 12:28:18
Discusses the full down dam site 120 meters to the reconstruction, according to the design after the completion of the new dam height of the outlet elevation, leading to the reservoir outlet water temperature lower in winter, directly affect the rime landscape.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区