|
关注:1
2013-05-23 12:21
求翻译:该拟建隧道位于邢汾高速清家沟,全长850m,最大埋深145m,取隧道位于Ⅳ1级围岩当中进行受力分析。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
该拟建隧道位于邢汾高速清家沟,全长850m,最大埋深145m,取隧道位于Ⅳ1级围岩当中进行受力分析。
问题补充: |
|
2013-05-23 12:21:38
The proposed tunnel is located in Xing Fen high-speed Qing Formation, a total length of 850m, the maximum depth of 145m, take the tunnel is located Ⅳ 1 surrounding rock which the force analysis.
|
|
2013-05-23 12:23:18
The proposed tunnel is located in high-speed-limited home address, and full-length 850 M, the maximum depth 145 M were planted, the tunnel is located at Level 1 of IV rock among the force analysis.
|
|
2013-05-23 12:24:58
Should plan to construct the tunnel to be located the Xing Shui river high speed clear village, span 850m, greatest burying depth 145m, takes the tunnel to be locatedⅣIn the middle of 1 level of adjacent formations carries on the stress analysis.
|
|
2013-05-23 12:26:38
The proposed tunnel at shanfen high-speed XING Qing trench, length 850m, maximum depth of 145m, take the tunnel at the force analysis of ⅳ surrounding rock of level 1.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区