当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:a. The power station has a big footprint and a large excavation to be stabilised. It could be relocated to be closer or incorporated within the dam structure with the turbines and generators housed within the structure with the electrical equipment to be relocated to a site away from the dam and above maximum flood lev是什么意思?

待解决 悬赏分:1 - 离问题结束还有
a. The power station has a big footprint and a large excavation to be stabilised. It could be relocated to be closer or incorporated within the dam structure with the turbines and generators housed within the structure with the electrical equipment to be relocated to a site away from the dam and above maximum flood lev
问题补充:

  • 匿名
2013-05-23 12:21:38
一个。电站有一个大的足迹和大开挖稳定。它可以搬迁到更接近或安置搬迁到一个站点,距大坝和最高洪水水位以上的电气设备的结构内的涡轮机和发电机的大坝结构内成立。
  • 匿名
2013-05-23 12:23:18
a.*的电站有一条很大的足迹和一个大挖有稳定。 它能够进一步接近可搬迁或纳入三峡大坝涡轮机和发电机的结构内的电气设备,与结构迁移到一个地点,远离了大坝和高于最高洪水位。
  • 匿名
2013-05-23 12:24:58
a. 发电站有将被稳定的一个大脚印和大挖掘。 它可能被调迁是更加接近的或在水坝结构之内被合并用在结构之内和发电器被安置的涡轮用将被调迁的电机设备对一个站点从水坝和在最大洪水水位之上。
  • 匿名
2013-05-23 12:26:38
a.电站具有占地面积较大和大型开挖将被稳定。它可以迁要靠近或法团在大坝结构内与涡轮机和发电机组用电气设备搬迁到离大坝和最大洪水级以上网站结构内安置。
  • 匿名
2013-05-23 12:28:18
.电站有一个大的足迹和有待稳定的一次大挖掘。可能是搬迁到跟利用离开在最大洪水水平上的障碍搬迁到地点的电源设备在结构内被其提供房子的涡轮和发电机一起在障碍结构
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭