|
关注:1
2013-05-23 12:21
求翻译:厂房其他部分,采用新风加空调箱的形式来满足对空调负荷的要求。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
厂房其他部分,采用新风加空调箱的形式来满足对空调负荷的要求。
问题补充: |
|
2013-05-23 12:21:38
Other parts of the plant, the form of fresh air plus air-conditioning box to meet the requirements of the air conditioning load.
|
|
2013-05-23 12:23:18
Other plant parts, the introduction of new wind turbine and air-conditioning in the form box to meet the requirements of air-conditioning load.
|
|
2013-05-23 12:24:58
The workshop other parts, use the new atmosphere to add the air conditioning box the form to satisfy to the air conditioning load request.
|
|
2013-05-23 12:26:38
Other parts of the plant, take the form of the fresh air and air handling unit to meet the demand for air conditioning load.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区