|
关注:1
2013-05-23 12:21
求翻译:I totally missed something and did not catch that 4 walls are missing recessed standards and shelving for product for the Star Mall project. There is just too much going on in everyone workload and misses are going to happen. But this is where I really need all the architects when drawing these plans as well as all t是什么意思? 待解决
悬赏分:1
- 离问题结束还有
I totally missed something and did not catch that 4 walls are missing recessed standards and shelving for product for the Star Mall project. There is just too much going on in everyone workload and misses are going to happen. But this is where I really need all the architects when drawing these plans as well as all t
问题补充: |
|
2013-05-23 12:21:38
我完全错过了一些东西,没有赶上4墙壁缺少槽的标准和产品搁置星商城项目。只是太多的事情在每个人的工作量和失误的事情发生。但是这是我真的需要所有的建筑师时,这些计划以及所有的差距团队正在审查图纸和建设这些商店开始带来了问题,当他们看到空白墙壁或他们认为设计没有任何意义。我真的需要你的帮助,在这里,直到我可以得到一个设计团队,真正帮助我设计项目管理。
|
|
2013-05-23 12:23:18
我完全失去了一些东西,听不清楚,缺少墙壁凹进式标准4和上架的产品,星级商场项目。 有的只是太多的事情做,每个人都工作负荷和不匹配的情况不会
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区