当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:列控中心应根据联锁进路、TSR命令、TCC线路限速初始化状态、与CBI和TSRS通信状态以及应答器位置等信息生成应答器报文。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
列控中心应根据联锁进路、TSR命令、TCC线路限速初始化状态、与CBI和TSRS通信状态以及应答器位置等信息生成应答器报文。
问题补充:

  • 匿名
2013-05-23 12:21:38
The train control center should be based on the interlocking approach tsr command, the tcc circuit speed limit initialization state, information and cbi and tsrs communication, state transponder location to generate the response packet.
  • 匿名
2013-05-23 12:23:18
The Center shall, in accordance with interlock to road, TSR command-line as soon as possible, TCC initialization state, and CBI TSRS communication and status, as well as transponder location information such as Answer is generated.
  • 匿名
2013-05-23 12:24:58
The row controls the center to be supposed to act according to the interconnection admission passage, the TSR order, the TCC line regulating initialization condition, and CBI and TSRS information production responder texts and so on correspondence condition as well as responder position.
  • 匿名
2013-05-23 12:26:38
Train control centre should interlock approach, TSR command, TCC circuit speed limit initialization state, communicates with the CBI and TSRS transponder and transponder information such as location generated messages.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭