|
关注:1
2013-05-23 12:21
求翻译:2010年4月至今参与SNATLONALOILWELL C033浮吊项目扒杆,转塔,滑轮组;装配及轨道安装工作是什么意思?![]() ![]() 2010年4月至今参与SNATLONALOILWELL C033浮吊项目扒杆,转塔,滑轮组;装配及轨道安装工作
问题补充: |
|
2013-05-23 12:21:38
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
|
|
2013-05-23 12:23:18
April 2010 has so far involved in SNATLONALOILWELL C par 033 floating crane project seeks to tap, pivots, assembling and installation work.
|
|
2013-05-23 12:24:58
In April, 2010 until now participates in SNATLONALOILWELL the C033 derrick barge project digging up the pole, the turret, the block and tackle; Assembly and track erection work
|
|
2013-05-23 12:26:38
April 2010-present participation in SNATLONALOILWELL C033 floating crane project Derrick, turret and pulleys; assemble and track installation work
|
|
2013-05-23 12:28:18
April 2010 the project has involved SNATLONALOILWELL C033 floating crane derrick, turret, pulley blocks; assembly and installation of the track
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区