|
关注:1
2013-05-23 12:21
求翻译:2006年5月—2007年6月参与文昌195和乐东8-3A导管架预制花片、井口片、立管卡子等组对及安装工作是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2006年5月—2007年6月参与文昌195和乐东8-3A导管架预制花片、井口片、立管卡子等组对及安装工作
问题补充: |
|
2013-05-23 12:21:38
May 2006 - 2007 in June and music Wenchang 195 East 8-3A jacket pre-Motif, wellhead piece, riser clamps and installation of such group
|
|
2013-05-23 12:23:18
May 2006 - June 2007 195 participating Wenchang and Le Dong A duct structure 8 - 3 prefabricated piece riser cards, wellhead chips, and installation work, such as the Group
|
|
2013-05-23 12:24:58
In May, 2006 - June, 2007 participates in wenchang 195 leading pipe support groups and so on prefabrication flower petal, well head piece, pipe riser clip with Ledong 8-3A to and the erection work
|
|
2013-05-23 12:26:38
May 2006: participation in Wenchang 195 and parakmeria lotungensis 8-3A jacket prefabricated flower piece, well, groups such as riser clamp and installation work
|
|
2013-05-23 12:28:18
May 2006 - 2007 in June and music Wenchang 195 East 8-3A jacket pre-Motif, wellhead piece, riser clamps and installation of such group
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区