当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Essential items for the Plant supplied consist of Turbine; Generator and Power Transformer, which are important equipments due to their role in generation of electricity, and the deviation from which may affect seriously the design of powerhouse; construction progress and overall construction schedule including civi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Essential items for the Plant supplied consist of Turbine; Generator and Power Transformer, which are important equipments due to their role in generation of electricity, and the deviation from which may affect seriously the design of powerhouse; construction progress and overall construction schedule including civi
问题补充:

  • 匿名
2013-05-23 12:21:38
所提供的植物的必备物品包括涡轮发电机和电力变压器,这是由于他们在发电中的作用的重要设备,可能严重影响了厂房的设计和偏差,施工进度和整体施工进度,包括土建工程部分。
  • 匿名
2013-05-23 12:23:18
至关重要的项目,包括涡轮机厂提供;发生器和电源变压器,这是由于其作用的重要设备发电。这种偏离,这可能严重影响设计的动力之源;建设进展和总体建设计划包括土木工程部分。
  • 匿名
2013-05-23 12:24:58
根本项目为由供应的植物包括涡轮; 发电器和电源变压器,是重要设备由于他们的在电的世代的角色和偏差也许严重影响大力士设计; 建筑进展和整体建筑日程表包括民用工作部分。
  • 匿名
2013-05-23 12:26:38
厂提供基本项目包括汽轮机 ;发电机和电力变压器,在发电,哪些重要的设备,因为它们的作用并从中偏差可能会严重影响设计的厂房 ;施工进度,以及整体建设计划包括民用工程部分。
  • 匿名
2013-05-23 12:28:18
植物的必要的条款提供包含涡轮;发电机 和力量改变者,是由于他们的电在一代中的 作用的重要设备,以及偏离从哪个愿 严重地影响发电站的设计;建造进展和
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭