求翻译:根据地质条件,考虑成本因素,选择合适的施工工艺,按照“先地下,后地上;先结构,后维护;先主体;后装修;先土建后专业的总体施工顺序原则”设计施工的总体部署方案和施工方案及制定相应的施工准备计划。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据地质条件,考虑成本因素,选择合适的施工工艺,按照“先地下,后地上;先结构,后维护;先主体;后装修;先土建后专业的总体施工顺序原则”设计施工的总体部署方案和施工方案及制定相应的施工准备计划。
问题补充:

  • 匿名
2013-05-23 12:21:38
According to the geological conditions, cost considerations, and select the appropriate construction techniques, in accordance with the first ground, after the ground; the first structure, after maintenance; first main body; after renovation; the overall principles of the construction sequence of th
  • 匿名
2013-05-23 12:23:18
In accordance with geological conditions, consider the cost factor, choose the appropriate construction technology, in accordance with the first floor, ground floor; and the first structure, maintenance and renovation; body; after the first professional construction sequence of the overall design an
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
According to the geological conditions, taking into account the cost factor, select the appropriate construction techniques, in accordance with the "first underground, the ground after first structure, maintenance; the principal; the decoration after; starting with the professional civil engineering
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 