求翻译:The AC system for Building 101 and 103 is using a Direct Expansion Refrigerant unit. The total cooling is only 373.53kW as compared with the required 422.63kW which is under sized and insufficient to treat sufficiently the outside air. They have mentioned in their submission that this system, they expect to have about 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The AC system for Building 101 and 103 is using a Direct Expansion Refrigerant unit. The total cooling is only 373.53kW as compared with the required 422.63kW which is under sized and insufficient to treat sufficiently the outside air. They have mentioned in their submission that this system, they expect to have about
问题补充:

  • 匿名
2013-05-23 12:21:38
建设101和103的交流系统使用直接膨胀式制冷机组。总的冷却是只373.53千瓦作为,这是根据大小和不足充分对待外界的空气所需的422.63千瓦相比。他们提到在其提交的这个系统,他们希望有一年约50天,不能满足RH的要求。在冬季采暖的设计是由电加热线圈。他们有增加,的加热从212.8千瓦以278.43千瓦。这将增加运营成本。屋顶单位的总报价只有rmb894,471.45,直接扩展单元以前的报价为人民币,471,931.17。
  • 匿名
2013-05-23 12:23:18
交流系统的建设101和103是使用一个直接膨胀制冷装置。 仅占总冷却 373.53kw 422.63kw 相比,所需的尺寸和不足以治疗是不够的外部空气。 他们也提到在他们的报告,这一制度,他们期待着在这一年里,50多天不能满足要求的相对湿度。 该设计的加热,冬天也由电加热线圈。
  • 匿名
2013-05-23 12:24:58
AC系统为楼101和103使用一个直接扩展冷冻剂单位。 共计冷却是仅373.53kW与在估量之下和不足充足地对待外部空气的必需的422.63kW比较。 他们在他们的提议提及了这个系统,他们在不可能符合RH要求的一年准备有大约50天。 设计为热化在冬天是由电子热线盘。 他们有增量热化从212.8kW到278.43kW。 这将增加运作费。 总引文为屋顶上面单位是仅RMB894,471.45,早先行情为直接扩展单位是RMB2,471,931.17。
  • 匿名
2013-05-23 12:26:38
建筑 101、 103 交流系统使用一个直接扩张制冷剂的单位。只有 373.53kW 与所需的 422.63kW 下中小型并不足以充分处理外部空气的总冷却。他们在其提交已提到这一系统,他们预计会有 50 天左右的一年,不能满足的 RH 的要求。冬季采暖的设计通过电加热线圈。他们已经增加到 278.43kW 212.8kW 从加热。这会增加运营成本。屋顶顶端装置的总报价是只有 RMB894,471.45,直接扩张单位以前报价是 2500 元人民币 471 931.17。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 