|
关注:1
2013-05-23 12:21
求翻译:关于PL D列柱子顶升补灌未满的问题,建议割去小管后进行二次补灌(用高标号、小坍落度混凝土填补捣实或开小孔压浆。)是什么意思?![]() ![]() 关于PL D列柱子顶升补灌未满的问题,建议割去小管后进行二次补灌(用高标号、小坍落度混凝土填补捣实或开小孔压浆。)
问题补充: |
|
2013-05-23 12:21:38
Pl d column column top l fill irrigation under the age of the problem, it is recommended that the second cuts off a small tube for supplemental irrigation (tamping or open holes grouting with high-grade, small slump concrete to fill.)
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
PL d column pillars lift irrigation is not full of problems, it is recommended that secondary supplemental irrigation after cutting tubular (high grade, low slump concrete filled ramming or a small hole Grouting. )
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区