当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:项目区沿线有既有22KV电力线,施工单位可以考虑直接接用,重点工程建议备用部分发电机组,以保证正常连续施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
项目区沿线有既有22KV电力线,施工单位可以考虑直接接用,重点工程建议备用部分发电机组,以保证正常连续施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
The project area along the existing 22kv power lines, construction units can be considered directly connected with the key projects recommended spare parts of generator sets, in order to ensure the normal continuous construction.
  • 匿名
2013-05-23 12:23:18
Project area KV along with a power line, as well as 22 construction unit can be taken into account, with a focus on direct access to the spare part that works to ensure that generators for normal construction.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Both 22KV line along the project area, the construction establishments can be used directly, with a focus on Engineering recommended an alternate generator in order to guarantee the normal continuous construction.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭