当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:第一、二、三代编织机(1#-35#)需要的安装位置大,第一、三代机安装区域需要长:3.6米,宽:1.8米;第二代机安装区域需要长:4.6米,宽1.8米,而第四、五代安装区域只是:长:2.8米,宽:1.9米是什么意思?

待解决 悬赏分:1 - 离问题结束还有
第一、二、三代编织机(1#-35#)需要的安装位置大,第一、三代机安装区域需要长:3.6米,宽:1.8米;第二代机安装区域需要长:4.6米,宽1.8米,而第四、五代安装区域只是:长:2.8米,宽:1.9米
问题补充:

  • 匿名
2013-05-23 12:21:38
First, two, three generations of weaving machines (1 # -35 #), the installation location of the first three generations of machine installation area needs: 3.6 m Width: 1.8 m; second-generation machine installation area needs: 4.6 m , 1.8 meters wide, while the fourth, the Five Dynasties and install
  • 匿名
2013-05-23 12:23:18
The first generation, 2, 3 weaving machine ( #1 - 35 of the #) need to install the location, the first generation machine installation, 3 regional needs to take a long, 3.6 m, width: 1.8m; the first 2 generations, the region needs to take a long, 4.6 m, Width 1.8 M, and the first generation 4, 5: Th
  • 匿名
2013-05-23 12:24:58
First, two, three generation of braiding machines (1#-35#) need the installment position is big, first, three generation of machine installment region needs to be long: 3.6 meters, width: 1.8 meters; The second generation of machine installment region needs to be long: 4.6 meters, width 1.8 meters,
  • 匿名
2013-05-23 12:26:38
I, II, III on behalf of knitting machines (1#-35#) where you want the installation, first generation machine installation area needs length: 3.6 meters, width: 1.8 m; the second generation machine installation area takes a long: 4.6 m, 1.8 m wide, and Disi、Wu is the zone is installed: length: 2.8 m,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭