|
关注:1
2013-05-23 12:21
求翻译:cross-sections taken before and after construction where such material is either imported from a locality more than 100 m from the point of use or is utilised in a portion of a fill which is in excess of 0.5 m above the original ground level.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
cross-sections taken before and after construction where such material is either imported from a locality more than 100 m from the point of use or is utilised in a portion of a fill which is in excess of 0.5 m above the original ground level.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区