|
关注:1
2013-05-23 12:21
求翻译:we found many problems after visiting the jobsite of supplier, e. g., although the company has passed ISO 9001 certificate in 2010 , actually his bad traceability of production, no effective control key performance control ,not stable enough furnace and centrifugal casting and bad No-confirming control,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
we found many problems after visiting the jobsite of supplier, e. g., although the company has passed ISO 9001 certificate in 2010 , actually his bad traceability of production, no effective control key performance control ,not stable enough furnace and centrifugal casting and bad No-confirming control,
问题补充: |
|
2013-05-23 12:21:38
来访的供应商,电子现场后,我们发现了许多问题。克。,虽然公司已通过ISO 9001认证,在2010年,其实他的坏可追溯性生产,没有有效控制的关键控制性能不够稳定炉,离心铸造和坏确认无控制,
|
|
2013-05-23 12:23:18
我们发现很多问题在访问了工地的供应商,e.g.,尽管本公司已在2010年通过了iso9001证书,实际上是他的生产可追溯性差,无法有效控制关键绩效控制,不够稳定炉和离心铸造和坏无确认控制,
|
|
2013-05-23 12:24:58
我们在参观供应商, e. jobsite以后发现了许多问题。 g., 2010年,虽然公司通过了ISO 9001证明,实际上他的生产的坏traceability,没有有效的控制键性能控制、槽枥足够的熔炉和不是离心铸件和坏没有证实的控制,
|
|
2013-05-23 12:26:38
我们发现很多问题访问的供应商,e.g.工地后虽然公司已通过 ISO 9001 证书在 2010 年,实际上他坏的生产,没有有效的控制关键性能控制,可追踪性不稳定的足够的炉和离心铸造和坏没有确认控制,
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区