求翻译:现在我公司厂房已经封顶,正准备进行设备基础施工,但是和设计院联系时得知,你公司没有按照第二次设计会议在7月中旬前提供完整的设备基础图纸,耽误了设计院为我公司提供图纸,也就耽误了设备基础的施工,造成工期进度推迟,希望你公司按照约定尽快提供设备基础图纸。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
现在我公司厂房已经封顶,正准备进行设备基础施工,但是和设计院联系时得知,你公司没有按照第二次设计会议在7月中旬前提供完整的设备基础图纸,耽误了设计院为我公司提供图纸,也就耽误了设备基础的施工,造成工期进度推迟,希望你公司按照约定尽快提供设备基础图纸。
问题补充:

  • 匿名
2013-05-23 12:21:38
Company plant has been capped and are preparing the equipment foundation, but learned and Design Institute of the contact, your company is not in accordance with the second design meeting in mid-July to provide a complete equipment foundation drawings, delay and Design Institute for provide drawings
  • 匿名
2013-05-23 12:23:18
It is now my company plant has been capping equipment, construction, infrastructure and Design Institute, however, when you contact your company does not have the design in accordance with Section 2 conference in mid-July before the device provides a complete infrastructure drawings has been delayed
  • 匿名
2013-05-23 12:24:58
Now our company workshop already placed an upper limit on, was preparing to carry on the equipment foundation construction, when with design institute relation knew, your company according to the second design conference in mid-July premise for the integrity equipment foundation blueprint, has not d
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 