|
关注:1
2013-05-23 12:21
求翻译:总投资为233.2亿元,项目工期为4年,长株潭城际铁路为双线,新建正线长度97.5公里,桥隧比79%区段最高设计行车速度可达200公里。是什么意思?![]() ![]() 总投资为233.2亿元,项目工期为4年,长株潭城际铁路为双线,新建正线长度97.5公里,桥隧比79%区段最高设计行车速度可达200公里。
问题补充: |
|
2013-05-23 12:21:38
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
The total investment is 23,320,000,000 Yuan, the project time limit for a project is 4 years, the long deep pool city border railroad is a double thread, the newly built main line length 97.5 kilometers, the bridge subterranean may amount to 200 kilometers compared to 79% sector highest design drivi
|
|
2013-05-23 12:26:38
Total investment of 23.32 billion yuan, project duration of 4 years, Changsha-Zhuzhou-Xiangtan intercity railway as a double line, new line length of 97.5 km bridge and tunnel sections than 79% maximum design speeds of up to 200 km h.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区