|
关注:1
2013-05-23 12:21
求翻译:Experience in manufacturing of Bulb turbine for at least two (2) projects. Each project consists of at least two (2) turbines with capacity of 10 MW or more and runner diameter of 5 meter or more. The supplied turbines have been operated successfully at least one (1) year.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Experience in manufacturing of Bulb turbine for at least two (2) projects. Each project consists of at least two (2) turbines with capacity of 10 MW or more and runner diameter of 5 meter or more. The supplied turbines have been operated successfully at least one (1) year.
问题补充: |
|
2013-05-23 12:21:38
至少两(2)项目在灯泡贯流式水轮发电机制造的经验。每个项目包括至少两(2)发电机组容量10兆瓦或以上,转轮直径5米以上。提供发电机组已成功运行至少一(1)年。
|
|
2013-05-23 12:23:18
在制造业的经验,至少有以下两个灯泡涡轮机(2)各项目。 每一个项目至少包括两个(2)涡轮机,其容量为10兆瓦或更长时间,并且热流道直径为5米或更多。 随附了涡轮机已成功运营至少一(1)年。
|
|
2013-05-23 12:24:58
经验在电灯泡涡轮制造业为至少二个(2个)项目。 每个项目包括至少二个(2个)涡轮以容量10兆瓦或更多和5米或更多的赛跑者直径。 由供应的涡轮成功地被管理至少一(1)年。
|
|
2013-05-23 12:26:38
至少两 2 项目的灯泡贯流式机组制造经验。每个项目包含至少两个 2 涡轮机能力为 10 兆瓦或多个与转轮直径为 5 米或更多。提供的涡轮机已经营成功,至少一个 1 年。
|
|
2013-05-23 12:28:18
至少二灯泡涡轮的制造中的经验 (2) 项目。每个项目包含至少二 (2) 有 10 MW 的能力的涡轮或更多和 5 米的运转的直径或更多。被提供的涡轮成功被操纵了至少一 (1) 年。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区