求翻译:桩位允许偏差:(a).定位:承台桩数为2桩以上承台桩:100mm以内。筏板桩基:100mm以内。(b).桩顶标高:-50mm~+50mm以内。截桩后的桩顶标高允许偏差为10mm以内。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
桩位允许偏差:(a).定位:承台桩数为2桩以上承台桩:100mm以内。筏板桩基:100mm以内。(b).桩顶标高:-50mm~+50mm以内。截桩后的桩顶标高允许偏差为10mm以内。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pile tolerances: (a) Positioning: Platform Pile for more than 2 Platform Pile: 100mm or less. Raft pile: 100mm or less. (B). Pile top elevation:-50mm ~ +50 mm or less. Cut pile after pile top elevation tolerances within  10mm.
  • 匿名
2013-05-23 12:23:18
Pile a permissible deviation: (a) the table position: There are 2 piles piles piles above the desk: 100 mm or less. raft the pile: 100mm or less. (b) pile top elevation: - + 50 MM to 50 mm or less. Cut the pile after pile top elevation variation  for 10 mm or less.
  • 匿名
2013-05-23 12:24:58
Pile position allowable deviation: (a). localization: Receives the Taiwan pile number is 2 piles by the deck Taiwan pile: In 100mm.Raft board pile foundation: In 100mm.(b). head of pile elevation: - In 50mm~+50mm.After truncation pile head of pile elevation allowable deviation for  10mm in.
  • 匿名
2013-05-23 12:26:38
Allowed deviation: (a). position: number of pile for more than 2 pile pile: less than 100mm. Raft Foundation: 100mm. (B). pile top elevation: within -50mm~+50mm. After cutting off the pile top elevation allows deviation is less than 10MM.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 