求翻译:本工程采用静压式沉桩,沉桩前须先清理地下障碍物。并严格控制沉桩速率,同时须采取其他有效措施。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
本工程采用静压式沉桩,沉桩前须先清理地下障碍物。并严格控制沉桩速率,同时须采取其他有效措施。
问题补充: |
|
2013-05-23 12:21:38
This project uses the static pressure pile driving, pile driving required before cleaning up underground obstructions. And strictly control the rate of the pile, and shall take other effective measures.
|
|
2013-05-23 12:23:18
This project reflects a hydrostatic-piles, piles sunk before clean up underground obstructions. Strict control and sunken piles rate, and other effective measures to be taken.
|
|
2013-05-23 12:24:58
This project uses the static pressure type penetration of pile, in front of the penetration of pile must clean up the underground obstacle first.And the strict control penetration of pile speed, simultaneously must take other effective actions.
|
|
2013-05-23 12:26:38
This project uses the static-pressure pile sinking, sinking first before cleaning up underground obstructions. And sinking rate of strict control, and other effective measures to be taken.
|
|