求翻译:沉桩应在施工组织设计经监理审核通过,并经设计交底后方可进行。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
沉桩应在施工组织设计经监理审核通过,并经设计交底后方可进行。
问题补充:

  • 匿名
2013-05-23 12:21:38
The pile should be in the construction design for approval by the supervising, and Design Details can be carried out.
  • 匿名
2013-05-23 12:23:18
Heavy pile should be at the construction organizations in the design, monitoring, auditing, and has been designed to the rear.
  • 匿名
2013-05-23 12:24:58
The penetration of pile should pass in the construction organization plan after the overseeing verification, and gives the low-down after the design only then carries on.
  • 匿名
2013-05-23 12:26:38
Pile in construction organization design adopted by the supervision and audit, and has been designed to give the low-down must be carried out.