求翻译:11.1.1. The VENDOR and Contractor shall carry out any tests as deemed necessary and as specified in the approved test procedure, including temperature and humidity checks over a time period, and a simulated system test before dispatch to site, to be made during the course of manufacture at the Vendor’s works.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
11.1.1. The VENDOR and Contractor shall carry out any tests as deemed necessary and as specified in the approved test procedure, including temperature and humidity checks over a time period, and a simulated system test before dispatch to site, to be made during the course of manufacture at the Vendor’s works.