当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:二级设计采购与制造进度用于有效地管理投标方责任范围内的设计、采购与制造是什么意思?

待解决 悬赏分:1 - 离问题结束还有
二级设计采购与制造进度用于有效地管理投标方责任范围内的设计、采购与制造
问题补充:

  • 匿名
2013-05-23 12:21:38
Two Engineering, Procurement and manufacturing schedule is used to effectively manage the design, procurement, and manufacturing within the scope of responsibility of the bidder
  • 匿名
2013-05-23 12:23:18
Level 2 design and manufacturing process used to effectively manage bidding parties within the responsibility of the design, procurement and manufacturing
  • 匿名
2013-05-23 12:24:58
Two levels of designs purchases and makes the progress to use in managing in the bid side responsibility scope effectively the design, the purchase and the manufacture
  • 匿名
2013-05-23 12:26:38
Two-level design, procurement and manufacturing progress for effectively managing bidders within the scope of the design, procurement and manufacturing
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭