当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:10.14.3 In occurrence of non-compliance with the rules set out in this NR, the MTE shall adopt the measures laid down in NR 3. 10.14.4 The documentation provided for this NR must be permanently available to workers who work in services and electrical installations, in compliance with the coverage, limitations and inter是什么意思?

待解决 悬赏分:1 - 离问题结束还有
10.14.3 In occurrence of non-compliance with the rules set out in this NR, the MTE shall adopt the measures laid down in NR 3. 10.14.4 The documentation provided for this NR must be permanently available to workers who work in services and electrical installations, in compliance with the coverage, limitations and inter
问题补充:

  • 匿名
2013-05-23 12:21:38
10.14.3在发生不遵守规则载于本星期日,山应采取的措施奠定了NR 3。 10.14.4本星期日提供的文件必须是工人工作在服务和电气装置,在遵守与任务上的覆盖范围,限制和干扰,永久可用。 10.14.5本星期日提供的文件必须是永久的主管机关处理。 10.14.6本星期日不适用于推动特低电压的电气装置。
  • 匿名
2013-05-23 12:23:18
在发生10.14.3不遵守规定的规则这nr,mte应通过规定的各项措施nr3。 提供的文档10.14.4nr必须对此提供给工作人员的永久服务及电力设施,遵守的范围、限制和干扰任务的通知。 提供的文档10.14.5nr必须为这所掌握的是永久的主管当局。
  • 匿名
2013-05-23 12:24:58
10.14.3在不顺从发生以在这NR开始的规则, MTE将采取在NR提出的措施3。 10.14.4为这NR提供的文献一定
  • 匿名
2013-05-23 12:26:38
10.14.3 在发生不遵守此 NR 所载的规则,山须采用 NR 3 所规定的措施。10.14.4 提供此 nr 的文档必须永久可用在服务和电子装置、 遵守覆盖范围、 限制和干扰的任务工作的工人。10.14.5 提供此 nr 的文档必须是永久的主管当局处置。10.14.6 这个 NR 不适用于超低电压引起的电气装置。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭