当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:件2底部蓝色线所画部分需在件2整体安装于件1 内部后再焊接在件2的主杆上,否则件2将无法装配。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
件2底部蓝色线所画部分需在件2整体安装于件1 内部后再焊接在件2的主杆上,否则件2将无法装配。
问题补充:

  • 匿名
2013-05-23 12:21:38
Blue line of the two at the bottom of the painting which need to be installed in 2 overall 1 internal and then welded to the 2 main poles, otherwise will not be able to assemble pieces 2.
  • 匿名
2013-05-23 12:23:18
Part 2 the bottom blue line in the picture section in part 2 you need to install whole-house, and then solder 1 in part 2 of the main stem, or 2 will not be able to assemble.
  • 匿名
2013-05-23 12:24:58
2 base blue streak draws the part to have again to weld in 2 whole installment after 1 interior on 2 master rod, otherwise 2 will be unable to assemble.
  • 匿名
2013-05-23 12:26:38
2 blue lines painted on the bottom part is installed first 2 overall in 2 in 1 internal, then welded on the mast, or 2 will not be able to assemble.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭