求翻译:路基每层填筑压实质量达到设计、验标及招标文件的要求,经检验并报请监理工程师批准后,方可进行下一层填筑施工。施工过程中还应经常检查排水坡和排水沟的情况。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
路基每层填筑压实质量达到设计、验标及招标文件的要求,经检验并报请监理工程师批准后,方可进行下一层填筑施工。施工过程中还应经常检查排水坡和排水沟的情况。
问题补充:

  • 匿名
2013-05-23 12:21:38
Each filling subgrade compaction quality to meet the design, inspection standards and the requirements of the tender documents, the inspection report to the supervising engineer for approval before the next layer of embankment construction. Construction process should also regularly check the draina
  • 匿名
2013-05-23 12:23:18
Each floor roadbed reclaimed pressure real volume reached the design, testing and tender document icon in the examination and approval requirements, Supervising Engineers conducted after approval by the next layer can be reclaimed construction. Throughout the course of the construction project shoul
  • 匿名
2013-05-23 12:24:58
The roadbed each reclamation compaction quality achieved the design, examines the sign and the tender document request, after examines and reports oversees engineer to authorize, only then carries on the next reclamation construction.In the construction process also should inspect the weathering and
  • 匿名
2013-05-23 12:26:38
Each floor filling of subgrade compaction quality meet the requirements of designing, examination of bid and tender documents, approval of the inspection and report it to the supervising engineer, before the next layer of embankment construction. During construction should always also check the drai
  • 匿名
2013-05-23 12:28:18
Each filling subgrade compaction quality to meet the design, inspection standards and the requirements of the tender documents, the inspection report to the supervising engineer for approval before the next layer of embankment construction. Construction process should also regularly check the draina
 
 