|
关注:1
2013-05-23 12:21
求翻译:边沟的整修应挂线进行。对各种水沟的纵坡应用仪器检验,修整到符合设计及规范要求。各种水沟的边坡,不得随意用土填补。填土路基两侧超填的宽度应预切除,遇边坡缺土时,必须挖成台阶,分层填补夯实。路基整修完毕后,堆于路基范围内的废弃土料应预清除。整修过的路基,应继续维修养护。为避免因下雨时对路基边坡的冲刷破坏。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
边沟的整修应挂线进行。对各种水沟的纵坡应用仪器检验,修整到符合设计及规范要求。各种水沟的边坡,不得随意用土填补。填土路基两侧超填的宽度应预切除,遇边坡缺土时,必须挖成台阶,分层填补夯实。路基整修完毕后,堆于路基范围内的废弃土料应预清除。整修过的路基,应继续维修养护。为避免因下雨时对路基边坡的冲刷破坏。
问题补充: |
|
2013-05-23 12:21:38
Ditch the renovation should be hung. Ditch the longitudinal application of various test equipment, repair to meet the design and specifications. The slope of the ditch, not free to be filled with soil. Fill embankment on both sides over filling the width of the pre-resection should be, the case of l
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
The side ditch renovation should tie a string carries on.To each kind of drainage lengthwise grade application instrument examination, repairs and maintains to conforms to the design and the standard request.Each kind of drainage side slope, does not have to use the earth to fill at will.The earth f
|
|
2013-05-23 12:26:38
Gutter repairs should be hanging up the phone. All gutters of longitudinal slope inspection application instruments, trimmed to conform to the design and specification requirements. Slope of the ditch, should be made with earth fill. Filling subgrade side Super fill width should be removed, in case
|
|
2013-05-23 12:28:18
Ditch the renovation should be hung. Ditch the longitudinal application of various test equipment, repair to meet the design and specifications. The slope of the ditch, not free to be filled with soil. Fill embankment on both sides over filling the width of the pre-resection should be, the case of l
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区