求翻译:混凝土浇筑标高比设计标高高出1m以上,多余部分在承台施工前凿除,确保桩头无松散层。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
混凝土浇筑标高比设计标高高出1m以上,多余部分在承台施工前凿除,确保桩头无松散层。
问题补充:

  • 匿名
2013-05-23 12:21:38
Concrete pouring elevation higher than 1m above the design elevation, the excess part of the slab before construction in addition to cutting, to ensure that no loose layer of the pile head.
  • 匿名
2013-05-23 12:23:18
concrete pouring Elevation design elevation higher than 1m, the excess over Taiwan in pre-construction contractors chisel except piles, to ensure that no loose head level.
  • 匿名
2013-05-23 12:24:58
The concrete construction elevation outdoes above 1m compared to the design elevation, the extra amount in receives before the Taiwan construction the chisel to eliminate, guarantees the pile-head not loose level.
  • 匿名
2013-05-23 12:26:38
1M higher elevation than concrete design elevation above, excess chisel except before the bearing platform construction, ensuring that no loose pile head layer.
  • 匿名
2013-05-23 12:28:18
Concrete pouring elevation higher than 1m above the design elevation, the excess part of the slab before construction in addition to cutting, to ensure that no loose layer of the pile head.
 
 