当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:挖孔达到设计标高后,进行孔底处理。做到平整,无松渣、污泥及沉渣等,入岩深度符合设计要求。在挖孔桩施工过程中,随时根据所挖出的土层和岩石情况绘制地质柱状图。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
挖孔达到设计标高后,进行孔底处理。做到平整,无松渣、污泥及沉渣等,入岩深度符合设计要求。在挖孔桩施工过程中,随时根据所挖出的土层和岩石情况绘制地质柱状图。
问题补充:

  • 匿名
2013-05-23 12:21:38
After digging the hole to reach the design elevation, the hole at the end of treatment. So smooth, no loose slag, sludge and sediment, etc., into the rock depth meet the design requirements. Digging holes in the pile construction process, the excavated soil at any time and draw the geologic column o
  • 匿名
2013-05-23 12:23:18
Meet the design elevation after digging holes in the bottom of the hole. Do not loose formation, Standard Chartered, sludge and dregs, such as the rock depth conform to the design requirements. The dug piles throughout the course of the construction project at any time, in accordance with the excava
  • 匿名
2013-05-23 12:24:58
Digs the hole after to achieve the design elevation, carries on Kong De to process.Achieves smoothly, the non-loose dregs, the sludge and the slime and so on, enter the crag depth to conform to the design requirement.In digs in the hole pile construction process, as necessary acts according to the s
  • 匿名
2013-05-23 12:26:38
After digging reach design elevation, of bottom-hole processing. Flat, no pine residue, sludge and sediment, and so on, into rock depth meet design requirements. In the process of digging pile construction, at any time under the dug up soil and rock a geological column chart.
  • 匿名
2013-05-23 12:28:18
After digging the hole to reach the design elevation, the hole at the end of treatment. So smooth, no loose slag, sludge and sediment, etc., into the rock depth meet the design requirements. Digging holes in the pile construction process, the excavated soil at any time and draw the geologic column o
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭