求翻译:承台砼拆模后,基坑及时用原土或透水性好的材料分层回填夯实。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
承台砼拆模后,基坑及时用原土或透水性好的材料分层回填夯实。
问题补充: |
|
2013-05-23 12:21:38
Slab concrete form removal, excavation time with the original soil or layered materials with good permeability backfill compaction.
|
|
2013-05-23 12:23:18
Demolition contractors on behalf model after Taiwan pit, using the original soil, or timely stratified backfill material good solid surface soils.
|
|
2013-05-23 12:24:58
After receives the Taiwan tong form removal, the hole excavated for building foundation promptly rams with the raw soil or the water-permeable good material lamination backfill.
|
|
2013-05-23 12:26:38
After bearing platform concrete form removal, excavation in time with the original hierarchy backfill tamping soil or water permeability is good material.
|
|
2013-05-23 12:28:18
Slab concrete form removal, excavation time with the original soil or layered materials with good permeability backfill compaction.
|