求翻译:墩底预留钢筋采用轴对称、帮条焊连接,钢筋绑扎完毕后拆除临时整体箍筋,并调整钢筋位置和绑扎塑料垫块,预留筋套塑料管保护并用木制框架固定其位置。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
墩底预留钢筋采用轴对称、帮条焊连接,钢筋绑扎完毕后拆除临时整体箍筋,并调整钢筋位置和绑扎塑料垫块,预留筋套塑料管保护并用木制框架固定其位置。
问题补充:

  • 匿名
2013-05-23 12:21:38
Steel pier at the end reserved for the use of axial symmetry, to help bar solder connections, after the removal of the temporary steel banding overall stirrups, and adjust the position and banding reinforced plastic pads, rib set aside to protect plastic pipe with a wooden frame and fixed its positi
  • 匿名
2013-05-23 12:23:18
tun floor reserved steel welded connection uses a symmetric article, steel, and help them get finished tied Dismantle temporary overall binder reinforcement, and adjustment location and tied plastic blocks, plastic pipe protection reserved tendon set and used wooden framework fixed its location.
  • 匿名
2013-05-23 12:24:58
The pillar bottom reserves the steel bar to use the axial symmetry, the gang strip welds the connection, after the steel bar binds finished demolishes the temporary overall stirrup, and adjusts the steel bar position and binds the plastic cushion, reserves the muscle set of plastic tube protection a
  • 匿名
2013-05-23 12:26:38
End of pier reserved by axis symmetry, welding of reinforcement connection, reinforced binding after the demolition of the temporary overall Stirrups, and adjust the location of reinforcement and assembling plastic cushion block, reserved reinforced plastic pipe protection with fixed wooden frame it
  • 匿名
2013-05-23 12:28:18
Steel pier at the end reserved for the use of axial symmetry, to help bar solder connections, after the removal of the temporary steel banding overall stirrups, and adjust the position and banding reinforced plastic pads, rib set aside to protect plastic pipe with a wooden frame and fixed its positi
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭