|
关注:1
2013-05-23 12:21
求翻译:根据其墩身截面的设计特点,拟采用翻模施工,同时,为缩短砼浇注时间,利用塔式吊机提升砼。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
根据其墩身截面的设计特点,拟采用翻模施工,同时,为缩短砼浇注时间,利用塔式吊机提升砼。
问题补充: |
|
2013-05-23 12:21:38
According to the pier cross-section design features, the use of molds to be constructed, in order to shorten time of concrete pouring, concrete to enhance the use of tower cranes.
|
|
2013-05-23 12:23:18
In accordance with its TUN as a cross-sectional design features, and intends to use molds, and at the same time, in order to reduce construction promises to pour time using tower crane upgrade promises.
|
|
2013-05-23 12:24:58
According to its pillar body section design characteristic, plans to use turns the mold construction, simultaneously, for reduction tong duration of pouring, use column crane promotion tong.
|
|
2013-05-23 12:26:38
Accordance with their Pier section of the design characteristics, to adopt turnover form construction, at the same time, in order to shorten the concrete pouring time, use of tower crane lifting concrete.
|
|
2013-05-23 12:28:18
According to the pier cross-section design features, the use of molds to be constructed, in order to shorten time of concrete pouring, concrete to enhance the use of tower cranes.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区