求翻译:本标段桥梁上部构造主要为后张法预应力砼预制T梁先简支后连续的桥梁上部构造施工。故本标段考虑采用预制场集中预制,架桥机对各桥逐孔安装的方法进行桥梁上部构造施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本标段桥梁上部构造主要为后张法预应力砼预制T梁先简支后连续的桥梁上部构造施工。故本标段考虑采用预制场集中预制,架桥机对各桥逐孔安装的方法进行桥梁上部构造施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
The tenders for the bridge superstructure major post-tensioned precast concrete T-beam the first simple and continuous construction of the bridge superstructure. Therefore, consider using the tenders pre-field pre-concentration, on the bridge machine-by-hole mounting bridge bridge superstructure con
  • 匿名
2013-05-23 12:23:18
The standard paragraph 1-23bridge construction mainly after the prestressed concrete prefabricated T Cheung Leung consecutive Jane support after the upper bridge construction works. Therefore, the standard paragraph, consider using prefabricated precast bridge on each machine on the bridge hole inst
  • 匿名
2013-05-23 12:24:58
This sign section bridge the superstructure mainly tong prefabricates T Liang after the tensioning pre-stressed first the simple support the continual bridge the superstructure construction.Therefore this sign section considered uses the prefabricated field centralism prefabrication, the bridge carr
  • 匿名
2013-05-23 12:26:38
This section of the bridge superstructure is mainly for post-tensioned prestressed concrete precast t-Liang Xian of simply supported-continuous bridge superstructure construction. Therefore this section considered the use of prefabricated set of prefabricated, bridging equipment on the bridge-by-hol
  • 匿名
2013-05-23 12:28:18
The tenders for the bridge superstructure major post-tensioned precast concrete T-beam the first simple and continuous construction of the bridge superstructure. Therefore, consider using the tenders pre-field pre-concentration, on the bridge machine-by-hole mounting bridge bridge superstructure con
 
 