求翻译:波纹管在安装前应做1KN径向压力试验及灌水试验,无变形和渗漏时才充许使用。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
波纹管在安装前应做1KN径向压力试验及灌水试验,无变形和渗漏时才充许使用。
问题补充: |
|
2013-05-23 12:21:38
Bellows should be done before installation 1KN radial pressure test and irrigation experiment, no deformation and leakage when fully allowed to use it.
|
|
2013-05-23 12:23:18
corrugated pipe before the installation should be done 1 KN radial pressure test pilot, no deformation and bilgewater only when permitted use and leakage.
|
|
2013-05-23 12:24:58
The corrugated pipe should perform the 1KN radial direction pressure test before the installment and irrigate the experiment, does not have when the distortion and the leakage only then imitates permits the use.
|
|
2013-05-23 12:26:38
Bellows 1KN radial pressure testing and should I do before installing irrigation test, is only allowed when no deformation and leakage.
|
|
2013-05-23 12:28:18
Bellows should be done before installation 1KN radial pressure test and irrigation experiment, no deformation and leakage when fully allowed to use it.
|