当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:余热锅炉应满负荷投入,即:锅炉进出口风阀全开(100%),旁路风门(0%)。考核期间不得人为降低锅炉的负荷(减小锅炉废气流通量),如因窑运行状况余热锅炉不能满负荷投入,视影响情况对测量值进行修订。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
余热锅炉应满负荷投入,即:锅炉进出口风阀全开(100%),旁路风门(0%)。考核期间不得人为降低锅炉的负荷(减小锅炉废气流通量),如因窑运行状况余热锅炉不能满负荷投入,视影响情况对测量值进行修订。
问题补充:

  • 匿名
2013-05-23 12:21:38
Waste heat boiler at full load input, ie: boiler import and export air valve fully open (100%), the bypass damper (0%). The appraisal period shall not be artificially reduce the load on the boiler (to reduce the boiler exhaust liquidity), as a result of the kiln operating conditions, waste heat boil
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Waste heat boiler inputs to be at full capacity, namely: boiler full import and export air valve (100%), the bypass damper (0%). Appraisal period shall not be artificially reduce boiler load (reducing the boiler exhaust gas circulation), as a result of kiln waste heat boiler in health cannot be inpu
  • 匿名
2013-05-23 12:28:18
The waste should the full load investment, namely: The boiler turnover rumor valve all starts (100%), bypass air throttle (0%).Inspection period does not have artificial to reduce the boiler the load (to reduce boiler waste gas circulation), if because of the kiln movement condition waste cannot the
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭