求翻译:混凝土开盘前应对各项准备工作进行全面检查,包括水、电、备料及计量、机具设备等。混凝土采用拌合楼拌和,龙门吊配合料斗运输砼。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
混凝土开盘前应对各项准备工作进行全面检查,包括水、电、备料及计量、机具设备等。混凝土采用拌合楼拌和,龙门吊配合料斗运输砼。
问题补充:

  • 匿名
2013-05-23 12:21:38
Concrete before the opening of the preparatory work should conduct a comprehensive inspection, including water, electricity, preparation and measurement of machinery and equipment. Mixing using mixing concrete floor, concrete gantry crane with hopper transport.
  • 匿名
2013-05-23 12:23:18
Concrete pre-opening should conduct a comprehensive inspection of preparations, including water, electricity, and are stocked up and measurement equipment, machine tools, and so on. Use concrete mixing floor cranes, mixing and matching transport promises hopper.
  • 匿名
2013-05-23 12:24:58
In front of the concrete opening price should carry on the comprehensive inspection to each preparatory work, wraps the scoop up last bit of water, the electricity, prepares materials and the measurement, the machines and tools equipment and so on.The concrete uses mixes the building to mix up, gant
  • 匿名
2013-05-23 12:26:38
Should thoroughly check the preparations before the opening of concrete, including water, electricity, wood handling and metrology, machines and equipment. Concrete mixing plant batching plant, crane combined with transport concrete hopper.
  • 匿名
2013-05-23 12:28:18
Concrete before the opening of the preparatory work should conduct a comprehensive inspection, including water, electricity, preparation and measurement of machinery and equipment. Mixing using mixing concrete floor, concrete gantry crane with hopper transport.
 
 