当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Formal analysis of the time to radiologic progression with the use of a stratified log-rank test was planned when approximately 227 progression events had occurred on the basis of RECIST. The required number of progression events was projected to occur by a prespecified cutoff date of是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Formal analysis of the time to radiologic progression with the use of a stratified log-rank test was planned when approximately 227 progression events had occurred on the basis of RECIST. The required number of progression events was projected to occur by a prespecified cutoff date of
问题补充:

  • 匿名
2013-05-23 12:21:38
正式分析的放射学进展与使用分层log-rank检验的时间计划时,约227进展事件发生的的RECIST基础上。进展事件所需数量预计将出现由一个预先设定的截止日期
  • 匿名
2013-05-23 12:23:18
正式分析的时间进度,放射的使用的一个分层登录排名测试时计划大约是227事件发生发展的基础上的recist。 所需数量的进展预测事件发生的一个预先指定的截止日期
  • 匿名
2013-05-23 12:24:58
当大约227个进步事件根据RECIST,发生了对时间的正式分析到放射性进步以用途对有层次日志排列测试计划了。 进步事件的必需的数量射出发生不迟于被预先指定的截止日期
  • 匿名
2013-05-23 12:26:38
使用分层的日志级别测试的时间到放射学进展正式分析计划时约 227 级数事件发生实体的基础上。所需的级数的事件数预计将出现按预先指定截止日期
  • 匿名
2013-05-23 12:28:18
到有一次成层的日志等级的测试的使用的放射医学的级数的时间的正式分析被计划当大约 227 桩级数事件在 RECIST 的基础上发生了。级数事件的所需数字被预计在一个指定前近路日期之前出现
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭