求翻译:梁体张拉在混凝土强度达到设计强度要求及以上且龄期大于7天方可进行。张拉采用YCQ150型穿心式千斤顶,两边同时张拉。张拉时两端加强联系,尽量保持同步。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
梁体张拉在混凝土强度达到设计强度要求及以上且龄期大于7天方可进行。张拉采用YCQ150型穿心式千斤顶,两边同时张拉。张拉时两端加强联系,尽量保持同步。
问题补充: |
|
2013-05-23 12:21:38
Tension in the concrete beam strength to meet the design strength and age requirements and more than seven days before proceeding. Tension-type feedthrough jack using YCQ150, both sides of the same tension. Tension at both ends to enhance contact, try to keep pace.
|
|
2013-05-23 12:23:18
The strength of concrete, Zhang Liang Commonwealth meet the design requirements and more intensity and age greater than 7 days. Zhang, introduced YCQ 150 through the heart in 1000 and two side-chang, simultaneously. When Chang, strengthen their ties with both ends to keep synchronization.
|
|
2013-05-23 12:24:58
Liang Tizhang pulls in the concrete intensity achieved the design intensity request and above also the stadium is bigger than 7 Arabia to be possible to carry on.Opens pulls uses YCQ150 to put on the heart type hoisting jack, nearby two simultaneously opens pulls.Zhang Lashi the both sides enhanceme
|
|
2013-05-23 12:26:38
Liang Ti tensile strength design of concrete strength and age greater than 7 days and above would be required. Tensioning of YCQ150 through the core-type Jack, while tension on both sides. Tension ends when closer links, try to keep it synchronized.
|
|
2013-05-23 12:28:18
Tension in the concrete beam strength to meet the design strength and age requirements and more than seven days before proceeding. Tension-type feedthrough jack using YCQ150, both sides of the same tension. Tension at both ends to enhance contact, try to keep pace.
|