|
关注:1
2013-05-23 12:21
求翻译:Existing Permanent Roads as identified in the Plan will generally be available for Contractor’s access to areas, however normal plant production traffic will have precedence over construction contractors. Future roads indicated on General Plot Plan mark up will not be available for Contractor’s use. Contractor will be 是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Existing Permanent Roads as identified in the Plan will generally be available for Contractor’s access to areas, however normal plant production traffic will have precedence over construction contractors. Future roads indicated on General Plot Plan mark up will not be available for Contractor’s use. Contractor will be
问题补充: |
|
2013-05-23 12:21:38
计划中确定的现有永久道路将一般为承包商地区的访问,但是正常的工厂生产的交通将拥有优先于建筑承包商。总图标志表示未来的道路不会是承包商的使用。承包商将负责任何损坏由承包商的所有道路的维修和恢复。
|
|
2013-05-23 12:23:18
现有的常任理事国的道路的计划中确定,一般将为承包商提供的访问区域,但是正常植物生产流量将优先于建筑承包商。 未来道路上所示一般图计划标记将不提供承包商使用。 承包商将负责维护和恢复的任何和所有道路损坏由承包商。
|
|
2013-05-23 12:24:58
现有的永久路如被辨认在计划一般为对区域的承包商的通入将是可利用的,然而正常工厂生产交通将有优先次序在工程承包商。 在一般布置图标记表明的未来路不会是可利用的为承
|
|
2013-05-23 12:26:38
现有的永久道路如计划中确定一般将供承包商的访问的区域,但是正常的植物生产交通将对建筑承建商具有优先权。未来的道路上一般的阴谋计划标记,表示不会供承包商的使用。承建商将负责维护和恢复的损坏由承建商的任何和所有道路。
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区