|
关注:1
2013-05-23 12:21
求翻译:Contractor shall perform all necessary de-watering and disposal of ground water. Storm drainage, surface drainage and discharge of construction wastes shall be managed to prevent pooling of water on the site and to prevent interference with the operations of other contractors and organizations on or adjacent to the dis是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Contractor shall perform all necessary de-watering and disposal of ground water. Storm drainage, surface drainage and discharge of construction wastes shall be managed to prevent pooling of water on the site and to prevent interference with the operations of other contractors and organizations on or adjacent to the dis
问题补充: |
|
2013-05-23 12:21:38
承包者应执行一切必要的脱水地下水和处置。排涝,地表排水和建筑废物的排放应在网站上,以防止水汇集和放电区或相邻的其他承包商和组织的行动,以防止干扰。
|
|
2013-05-23 12:23:18
承包者应执行所有必要脱水和处置的地下水。 雨水管道、表面排水和建筑废料的排放管,防止池水的网站上,防止干扰的行动与其他承包商和组织或相邻地区的排放。
|
|
2013-05-23 12:24:58
承包商将实行基础的所有必要脱水和处理。风暴排水,建造的表面的排水和释放浪费将被管理在地点防止水的组合,防止有其他承包商和团体的操作的干涉上或紧接释放地区。
|
|
2013-05-23 12:26:38
承建商应执行所有必要降水和处置的地下水。排涝、 地面排水和排放建筑废物须托管,防止汇集在网站上的水,对防止干扰其他承建商和组织的行动或相邻的放电等领域。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区