|
关注:1
2013-05-23 12:21
求翻译:c.两梁端部伸出的预留纵向钢筋,应按设计和规范要求彼此焊接或采用套筒压接。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
c.两梁端部伸出的预留纵向钢筋,应按设计和规范要求彼此焊接或采用套筒压接。
问题补充: |
|
2013-05-23 12:21:38
c. Two ends of beam longitudinal reinforcement out of the reserve, the design and specifications should be welded to each other or use crimp sleeve.
|
|
2013-05-23 12:23:18
c2Dr tip stretched out by the vertical steel bars, should be reserved According to the design and specification requires that each other using sleeve welding or soldering.
|
|
2013-05-23 12:24:58
c 0.2 Liang noses stretch out the reservation longitudinal reinforcement, should requests each other welding according to the design and the standard or uses the sleeve compression connection.
|
|
2013-05-23 12:26:38
c. Two longitudinal reinforcement of beam end out of the reserve, according to the design and specification requirements use Socket crimp or welded to each other.
|
|
2013-05-23 12:28:18
c. Two ends of beam longitudinal reinforcement out of the reserve, the design and specifications should be welded to each other or use crimp sleeve.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区