求翻译:当钻孔深度达到设计要求时,应立即用超声波桩孔检测仪(K-400型侧壁仪)对孔深、孔径、孔形和孔底沉渣量进行检查,确认满足设计要求后,报请监理工程师批准,监理工程师认可后,立即进行清孔。清孔利用钻机的反循环系统,采用气举抽浆法进行换浆清孔,在清孔的同时,将附着于护筒壁的泥浆清洗干净。清孔应达到以下标准:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当钻孔深度达到设计要求时,应立即用超声波桩孔检测仪(K-400型侧壁仪)对孔深、孔径、孔形和孔底沉渣量进行检查,确认满足设计要求后,报请监理工程师批准,监理工程师认可后,立即进行清孔。清孔利用钻机的反循环系统,采用气举抽浆法进行换浆清孔,在清孔的同时,将附着于护筒壁的泥浆清洗干净。清孔应达到以下标准:
问题补充:

  • 匿名
2013-05-23 12:21:38
When the drilling depth to meet the design requirements, should be immediately the ultrasonic Pile detector (k-400-type sidewall instrument) to check the hole depth, pore size, hole shape and hole sediment amount, confirm to meet design requirements, submitted to the Commissioner of Engineer for app
  • 匿名
2013-05-23 12:23:18
When the drilling depth design requirements, you should immediately test piles with an ultrasound scanner (K - side wall 400 of the depth of the hole is), aperture, hole-reared and bottom of the hole is to check and verify that meet the design requirements, approved by the engineer, the engineer, im
  • 匿名
2013-05-23 12:24:58
When the drill hole depth achieved when design request, should use the ultrasonic wave pile hole instrumentation immediately (K-400 sidewall meter) to the depth of hole, the aperture, Kong Xing and the hole bottom slime quantity carries on the inspection, after confirmed satisfies the design request
  • 匿名
2013-05-23 12:26:38
When drilling depth when you meet the design requirements, you should immediately pile holes by ultrasonic detector (K-400 type side wall unit) on the hole depth, hole, holes and holes check amount of sediment, after verifying that meet the design requirements, for the approval of supervision engine
  • 匿名
2013-05-23 12:28:18