|
关注:1
2013-05-23 12:21
求翻译:(2)墙身施工:底板砼强度达到75%时,可绑墙身钢筋,支墙身模板,内模一律采用大块防水竹胶合板以保证砼外观质量经检验合格后浇注墙身砼,在浇注过程中如有不便施工,在浇筑过程中严格按照分层浇筑并逐层往前推进的方式进行。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
(2)墙身施工:底板砼强度达到75%时,可绑墙身钢筋,支墙身模板,内模一律采用大块防水竹胶合板以保证砼外观质量经检验合格后浇注墙身砼,在浇注过程中如有不便施工,在浇筑过程中严格按照分层浇筑并逐层往前推进的方式进行。
问题补充: |
|
2013-05-23 12:21:38
(2) wall construction: bottom 75% of concrete strength, steel can be tied to the walls, supporting walls of the template, the internal model be using large waterproof plywood to ensure the quality of the concrete exterior walls by pouring concrete after passing inspection, in casting process, if any
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
(2) wall body construction: The ledger wall tong intensity achieved when 75%, may tie up the wall body steel bar, the wall body template, the cast all uses the bulk to guard against the phyllostachys congesta plywood to guarantee tong the outward appearance quality qualified pours the wall body afte
|
|
2013-05-23 12:26:38
(2) wall construction: bottom plate concrete strength reaches 75%, tying wall reinforcement, wall templates, internal model of the large waterproof bamboo plywood to ensure the appearance quality of concrete walls after inspection by pouring concrete, cast if any inconvenience during construction, i
|
|
2013-05-23 12:28:18
(2) wall construction: bottom 75% of concrete strength, steel can be tied to the walls, supporting walls of the template, the internal model be using large waterproof plywood to ensure the quality of the concrete exterior walls by pouring concrete after passing inspection, in casting process, if any
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区