求翻译:(4)最后施工箱涵的八字墙,同样采用搭设支架大块定型模板组合施工的方法进行施工。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
(4)最后施工箱涵的八字墙,同样采用搭设支架大块定型模板组合施工的方法进行施工。
问题补充: |
|
2013-05-23 12:21:38
(4) Finally, the character of construction of box culvert wall, the same shape using a combination of templates puts up large frame construction method of construction.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
(4) finally constructs the slab culvert aliform, similarly uses puts up the support bulk stereotypia template combination construction the method to carry on the construction.
|
|
2013-05-23 12:26:38
(4) the final construction of box culvert caret shaped wall, the same installation bracket chunk type template composite construction method for construction.
|
|
2013-05-23 12:28:18
(4) Finally, the character of construction of box culvert wall, the same shape using a combination of templates puts up large frame construction method of construction.
|