当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本标段隧道工程明洞按明挖法施工,暗洞按新奥法施工。该隧道主要为Ⅲ、Ⅳ、Ⅴ级围岩为主。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本标段隧道工程明洞按明挖法施工,暗洞按新奥法施工。该隧道主要为Ⅲ、Ⅳ、Ⅴ级围岩为主。
问题补充:

  • 匿名
2013-05-23 12:21:38
The tenders by open-cut tunnel construction method Myeong-dong, dark hole by NATM. The tunnel is mainly Ⅲ, Ⅳ, Ⅴ grade rock-based.
  • 匿名
2013-05-23 12:23:18
This icon works section of the tunnel at Myeong-dong-dong and cut-and-law, construction law in new construction. The tunnel is mainly III , IV V , Wai level rock-oriented.
  • 匿名
2013-05-23 12:24:58
This sign section tunneling Ming Dong according to open excavation law construction, dark hole according to new Austria law construction.This tunnel mainly isⅢ,Ⅳ,ⅤLevel adjacent formation primarily.
  • 匿名
2013-05-23 12:26:38
The sign section tunnel construction Myeongdong is provided of open construction, Andong at the new Austrian tunnelling method construction. Tunnel major-ⅲ, ⅳ, ⅴ-class surrounding rock-oriented time.
  • 匿名
2013-05-23 12:28:18
The tenders by open-cut tunnel construction method Myeong-dong, dark hole by NATM. The tunnel is mainly Ⅲ, Ⅳ, Ⅴ grade rock-based.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭