求翻译:Returned copies of drawings with Code "C2" and "C3" shall be resubmitted not later than ten (10) days after the date of transmittal by Contractor of such copies of such drawings.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Returned copies of drawings with Code "C2" and "C3" shall be resubmitted not later than ten (10) days after the date of transmittal by Contractor of such copies of such drawings.
问题补充: |
|
2013-05-23 12:21:38
应重新提交的图纸与代码“C2”及“C3”返回的副本,不得迟后,送由承包商等图纸等副本之日起十(10)天。
|
|
2013-05-23 12:23:18
图纸副本返回代码“C2”和“c3”应不晚于提交后的十(10)天的送文函的日期由承包商的这种这种图纸的副本。
|
|
2013-05-23 12:24:58
图画的返回的拷贝以代码“C2”和“C3”将由Contractor的这样拷贝不更晚再传送比十(10)天在传送之后的这样图画。
|
|
2013-05-23 12:26:38
返回代码"C2"图纸复印件和"C3"须不迟于十个 10 天送文函的日期后提交此类绘图的这类副本的承建商。
|
|
2013-05-23 12:28:18
以代码“C2”和“C3”归还份的素描将不迟于十被重新提交 (10) 在由这样的素描的这样的复件的承包商所作的传送的日期之后几天。
|