当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Yes, for electrical load calculation, we have very clear direction that Tongji need to take care of the calculation according to local practice especially in third party tenant part, since at this stage, we do not know the exact electrical power requirements for each tenant, and most of visitors are local people with l是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Yes, for electrical load calculation, we have very clear direction that Tongji need to take care of the calculation according to local practice especially in third party tenant part, since at this stage, we do not know the exact electrical power requirements for each tenant, and most of visitors are local people with l
问题补充:

  • 匿名
2013-05-23 12:21:38
是,对电力负荷的计算,我们有非常明确的方向,同济需要采取照顾的计算,按照当地惯例,特别是在第三方租户部分,因为在这个阶段,我们不知道确切的电力需求,每个租户,和大多数的游客都是当地人民与当地的消费习惯,同济需要提供计算。
  • 匿名
2013-05-23 12:23:18
“Yes”(是),可用于电气负载计算,我们有很明确的方向,同济需要照顾的计算根据当地作法特别是在第三方承租人部分,因为在这一阶段,我们不知道确切电源要求为每个租户,其中大部分的访问者是当地居民在当地的消费习惯,需要同济戴斯大酒店以计算。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
是的电力负荷计算,我们有非常明确的方向,同济大学需要照顾本地的做法,尤其是在第三方租客部分,计算以来
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭