|
关注:1
2013-05-23 12:21
求翻译:明洞段开挖结束,边、仰坡锚、网、喷防护结束或暗洞进洞施工正常即可开始明洞及洞门混凝土的施工。混凝土浇筑前,彻底清除浮渣并夯实,绑扎仰拱钢筋,浇筑仰拱混凝土,再施工下一循环。当明洞仰拱施工完成后,及时的安装明洞段纵向排水管,进行仰拱混凝土回填。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
明洞段开挖结束,边、仰坡锚、网、喷防护结束或暗洞进洞施工正常即可开始明洞及洞门混凝土的施工。混凝土浇筑前,彻底清除浮渣并夯实,绑扎仰拱钢筋,浇筑仰拱混凝土,再施工下一循环。当明洞仰拱施工完成后,及时的安装明洞段纵向排水管,进行仰拱混凝土回填。
问题补充: |
|
2013-05-23 12:21:38
Myeong-end section of the excavation, side, Yang slope anchor, nets, protective spray, or the end of the normal dark hole hole to start the construction of concrete construction Myeong-dong and Portal. Concrete pouring to remove scum and reinforce, invert banding steel, pouring concrete invert, and
|
|
2013-05-23 12:23:18
Paragraph end digging, Myeong-dong, Songpa-gu Yangshao anchor, web, spray-protective end or dark hole normal could start construction Myeong-dong-dong-dong and door-concrete construction. Prior to concrete pouring thoroughly remove scum and solidify his head, tied arch steel arches upward, pouring c
|
|
2013-05-23 12:24:58
Ming Dongduan excavates the conclusion, Yang Pomao, the net, spurt the protection to finish or the dark hole enter the hole construction normal then to start Ming Dong and the portal concrete construction.Before the concrete construction, eliminates the dross thoroughly and rams, binds inverts the s
|
|
2013-05-23 12:26:38
Myeongdong excavation ends, edges, inverted slope of bolt, net, sprayed protective ends or Andong normal to start the Myeongdong hole construction and concrete construction Portal. Before concrete pouring, thoroughly eliminate scum and consolidating, assembling inverted arch reinforced, poured concr
|
|
2013-05-23 12:28:18
Myeong-end section of the excavation, side, Yang slope anchor, nets, protective spray, or the end of the normal dark hole hole to start the construction of concrete construction Myeong-dong and Portal. Concrete pouring to remove scum and reinforce, invert banding steel, pouring concrete invert, and
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区